- Model NO.: ZYYX80-250
- Forging Forming Method: Cold Roll Forming
- Feature: Automation
- Warranty: 12 Months
- Advantage: Easy to Maintenance
- Rollers Material: Cr12 Mould Steel with Quenched Treatment
- Cutting Blade: Cr12 Mould Steel with Quenched Treatment
- Application: Purlin of Buildings
- Electric Elements: Mitsubishi PLC and Transducerr
- Transport Package: 1X40gp
- Origin: China
- Type: Rolling Machine
- Power Source: Electric
- Certification: SGS, BV, CE, ISO
- Customized: Customized
- Condition: New
- Shafts Material: High Grade No.45 Carbon Wrought Steel
- Brand Name: Zhongyuan
- Power: 15kw
- Trademark: zhongyuan
- Specification: CE SGS BV
- HS Code: 84552210
Our Advantages                                     Â



Easy operate & Safe                                  Â
Introduced Mitsubishi PLC with touch screen. Friendly man-machine interaction.
The system is simple to learn and easy to operate.
The final product can be cut as per set length in PLC controller, and the length is automatically measured by encoder. When final product reaches the set length, machine will stop to cut the product automatically. Finish this action, machine will run again continuously.Â
Data
Technical parameters | ||
Item | Specification | |
 Raw Material |
Type | galvanized coils |
Thickness(mm) | 1.5-3.0 | |
Yield strength(mpa) | 235-345 | |
Roller material | Cr12 mould steel | |
Hardness of rollers | HRC58-60 | |
Shaft for rollers | Solid shaft with 82mm,processed with cylindrical grinder | |
Forming speed(m/min) | About 10-15 | |
Speed adjusting mode | Misubishi frequency transformer | |
Roller drive                                               | Decelerating motor + Chain drive | |
Cutting mode | Hydraulic cutting | |
Cutter material | Cr12 mould steel | |
Length measurement | Nemicon Encoder | |
Control mode | Mitsubishi PLC | |
Operating mode | Button + Mitsubishi Touch screen | |
Main motor power(kw) | About15KW | |
Total power(kw) | About 20.5KW | |
Process flow | Decoiler -- Feeding & Guiding -- Roll forming---Hydraulic Cutting - product to run out table | |
Components of machine | ||
Decoiler (manual decoiler and hydraulic decoiler for option) | 1set | |
Feeding & guiding device | 1set | |
Main roll forming machine | 1set | |
Hydraulic cutting system | 1set | |
Mitsubishi Controlling system | 1set | |
Run out table | 1set  |
Our Certificate                                       Â

FAQ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â
Q1:When your factory extablished?Â
A1:Â We extablished since 2003, team with engineers who have 20 years experience in metal forming machine industry. We produce machine all-in-house, from raw material to ready machine, all done in our factory, so that we can control our machine quality and delivery time.Â
Q2:How long does it take to deliver the machine after the order & deposit?
A2:Usually it will take 50-60 working days to manufacture the machine and make it ready to deliver. At first 15 days the technical drawing will be made. The second 25 days start manufacturing the parts and ready to assemble. In the last 20 days the machine will be assembled and inspected to make sure it is ready to deliver.
Q3:What is your warranty term?
A3:Machine warranty time is 12 months. We supply life time service for our produced machines for all customers.Â
Q4:Can you offer oversea service?
A4:Yes,we have experienced technicians who can be sent to different countries to install our machines and supply others service .
Â
Sealing Machine,Plastic Bag Sealing Machine,Plastic Sealing Machine,Vacuum Sealer Machine
Hangzhou Jingyi E-commerce Co.,Ltd , https://www.jypackmfg.com