Model NO.: LHNG
Prime Power: 400-4000kw
Rated Frequency: 50/60Hz
Rated Voltage: 400V/230V
Model Number (Engine Type): Lhng
Power Factor: 0.8
Exciting Method: Brushless
Gas Pressure: 80-200kpa
Overhaul Time: More Than 30000HS
Rated Speed: 1000/1200/1300/1500r/Min
Trademark: LVHUAN
Transport Package: Exporting Standarded Packing
Specification: 6200x2100x2650mm
Origin: Shandong, China
HS Code: 85022000
Model NO.: LHNG
Prime Power: 400-4000kw
Rated Frequency: 50/60Hz
Rated Voltage: 400V/230V
Model Number (Engine Type): Lhng
Power Factor: 0.8
Exciting Method: Brushless
Gas Pressure: 80-200kpa
Overhaul Time: More Than 30000HS
Rated Speed: 1000/1200/1300/1500r/Min
Trademark: LVHUAN
Transport Package: Exporting Standarded Packing
Specification: 6200x2100x2650mm
Origin: Shandong, China
HS Code: 85022000
kw mw Gas Power Plant or Natural Gas Generator PriceCE approved Product Description
1. +20 years professional manufacturer.
2. Wide power range: 10kw-5000kw gas generator, single or parallel running.
3. Multi-option of engine, alternator, control system and cooling system, PLCÂ control panel.
4. Long continuous running hours, 8000 hours per year.
5. CE & ISO approved
6. OEM provided
7. Holding many patents
8. Perfect service system(Sales, Installation, Debugging and after-sale service)
9. Full Range: our products mainly include natural gas generator, biogas generator, biomass generator, coal gas generator, syngas generator, coal-bed gas generator, coke oven gas generator, diesel generator etc.Â
Â
Product Features
Main spare parts:
1.Control system: America Woodward control system
2. Controller: ComAp, Deepsea, Woodward
3.Ignition system: American ALTRONIC, including:magneto, high-tension coil
4. Starting system: DC 24V electric motor.Â
5. Mixer:Â IMPCO
6. Spark plug:Â STITT
Â
Generator Set worksite requirements
The worksite needs to meet following basic requirements:
 a) Ambient temperature between -40ºC~40ºC;
 b) Relative humidity less than 95%(35ºC);
 c) Site elevation not higher than 3500m;
 d) For outdoor installation, simple rain shelter is required.
Â
Requirements for Biogas
Within 1m from pressure regulation valve of gas intake
1. Gas Temperature≤40ºC
2. Pressure 80~200kpa, Changing Rate≤1kpa/min
3. H2S≤20mg/Nm³
4. Content of CH4≥70%
5. Impurity Particle Size≤5μm, impurity content≤30mg/Nm³
6. Moisture Content≤40g/Nm³
Some Tips
Higher content of sulfur and ammonia is not only seriously corrodes the spark plug, but also increase the lubricant's acid value, and then gen-set internal parts will be corroded partly. That will shorten the gen-set's life time. So the gas scrubbing is very important!
Technical Parameters for 10-600kw Natural Gas Generator Set
 | |
Model Number | LHNG |
Brand Name | LVHUAN |
Prime Power | 8-480KW |
Rated Power | 10-600KW |
Gas Mixed Mode | Outside |
Rated Speed | 1500rpm/1000rpm |
Rated Frequency | 50/60Hz |
Rated Voltage | 400V/230VÂ |
Rated Current | 18-1080A |
Phase | AC 3-Phase, 4 Wire |
Gas Pressure | 80-200kpa |
Intake Mode | Natural Intake/Supercharging and Inter Cooler |
Voltage Stability | ≤±2% |
Voltage Transient | ≤±10% |
Voltage Stable Time | ≤1s |
Heat Consumption | ≤9.8mj/kw.h |
Lubricant Consumption | 1-1.3g/kw.h |
Noise | 75-105dB(A) |
Cylinder Number | 4/6/12 |
Cylinder Bore | 100/105/135/138/190mm |
Starting System | DC 24V Electric Motor |
Sparking Mode | Spark Plug |
Cooling Method | Circlulating Water Cooling |
Lubricant Method | Passive and Flying Lubricant |
Isolation Class | H |
Protection | IP23 |
Alternator | Siemens, Standford, Leroy Somer, Marathon, etc. |
Power Factor | 0.8 Lagging |
Exciting Method | Brushless |
Colour | You Decide |
Certificates | ISO 9001:2008, CE |
Warranty | 1 Year |
Overheal Time | More Than 30000h |
Type | Open |
Control System | Automatic Alarm System |
Size | 1450*700*1100mm~6000*1970*2735mm |
Weight | 600kg~12000kg |
Applied Range for Natural Gas Generator
1. Oil Field
2. Industrial Zone
3. Petroleum Chemical
4. Using Natural Gas Generator Set as Standby Power Source
5. Supplying Power for Auxiliary Engine which work in Oil Well.
Â
Service committee for gas generator:
1. Pre-sale service:Â
1) We will send our engineer to prospect the site of power station free of charge.
2) According to the situation of site, we will provide design drawings, such as power plant floor drawing, cooling system drawing, genset foundation, control room design, etc.
Â
2. Sale service:
1) Operator training would be conducted by Lvhuan technicians during the process of commissioning or Factory training course in China,
2) Installation and commission of the genset would be instructed assisted by Lvhuan technicians at site.
Â
3. After-sale service:
1) We have strong after-sale team, we will response within 24 hours and provide technical supports by phone or site guiding, help our clients to gain the biggeset profit.
2) For the quality problem, we will service for you free of charge during the guarantee period.
3) We  provide one year guarantee period and lifetime service.
Â
Plentiful spare part supply:
1. We have spart parts department, plentiful spare part supply for all genset model will guarantee genset lifetime running.
2.All parts were from original factories or professional factories,complete in specification, keep good quality.
Â
FAQs:
1. Are you factory? and where is your factory?
Yes, we are. Our factory is located in Zhangqiu Longshan subdistrict, Jinan city, Shandong province, Welcome to visit our factory.
2. How to choose the right model?
To choose a right model, we need to know required continuous output power, local voltage and frequency and fuel (such as diesel, natural gas, biogas, biomass gas, coal gas, syngas, etc.). For biomass power plant and coal gas power plant, some clients may doesn't have gasification system, then we need information about raw material.
Â
3. What's the genset warranty?
The warranty is one year. We will offer free service and spare parts during warranty period. Lifetime service will be provided by our trustworthy after-sale team.
Â
4. How to do the maintenance?
Operator training will be provided by our technician. After training, local operator can do the basic maintenance by themselves according to our maintenance manual.
Â
5. Will be operation training offered?
Yes, operator training would be conducted by our technicians during the process of commissioning or factory training course in China.
Â
6. What's about the installation and commissioning?
Installation and commissioning of the genset would be instructed assisted by our technicians on site.
7. What is your regular delivery time?
20 days after order releasing.
Certificates & Patents for gas generator: We are committed to providing every product superior in quality.Â
Â
Professional Manufacturer for Gas Generator
Â
Showcase for Generators
Â
Customers Trust our Gas Generators
Â
Professional Packing & Loading Team
Â
Please feel free to contact Sarah for any question.
 kw mw Gas Power Plant or Natural Gas Generator Price
CE approved Product Description
1. +20 years professional manufacturer.
2. Wide power range: 10kw-5000kw gas generator, single or parallel running.
3. Multi-option of engine, alternator, control system and cooling system, PLCÂ control panel.
4. Long continuous running hours, 8000 hours per year.
5. CE & ISO approved
6. OEM provided
7. Holding many patents
8. Perfect service system(Sales, Installation, Debugging and after-sale service)
9. Full Range: our products mainly include natural gas generator, biogas generator, biomass generator, coal gas generator, syngas generator, coal-bed gas generator, coke oven gas generator, diesel generator etc.Â
Â
Product Features
Main spare parts:
1.Control system: America Woodward control system
2. Controller: ComAp, Deepsea, Woodward
3.Ignition system: American ALTRONIC, including:magneto, high-tension coil
4. Starting system: DC 24V electric motor.Â
5. Mixer:Â IMPCO
6. Spark plug:Â STITT
Â
Generator Set worksite requirements
The worksite needs to meet following basic requirements:
 a) Ambient temperature between -40ºC~40ºC;
 b) Relative humidity less than 95%(35ºC);
 c) Site elevation not higher than 3500m;
 d) For outdoor installation, simple rain shelter is required.
Â
Requirements for Biogas
Within 1m from pressure regulation valve of gas intake
1. Gas Temperature≤40ºC
2. Pressure 80~200kpa, Changing Rate≤1kpa/min
3. H2S≤20mg/Nm³
4. Content of CH4≥70%
5. Impurity Particle Size≤5μm, impurity content≤30mg/Nm³
6. Moisture Content≤40g/Nm³
Some Tips
Higher content of sulfur and ammonia is not only seriously corrodes the spark plug, but also increase the lubricant's acid value, and then gen-set internal parts will be corroded partly. That will shorten the gen-set's life time. So the gas scrubbing is very important!
Technical Parameters for 10-600kw Natural Gas Generator Set
 | |
Model Number | LHNG |
Brand Name | LVHUAN |
Prime Power | 8-480KW |
Rated Power | 10-600KW |
Gas Mixed Mode | Outside |
Rated Speed | 1500rpm/1000rpm |
Rated Frequency | 50/60Hz |
Rated Voltage | 400V/230VÂ |
Rated Current | 18-1080A |
Phase | AC 3-Phase, 4 Wire |
Gas Pressure | 80-200kpa |
Intake Mode | Natural Intake/Supercharging and Inter Cooler |
Voltage Stability | ≤±2% |
Voltage Transient | ≤±10% |
Voltage Stable Time | ≤1s |
Heat Consumption | ≤9.8mj/kw.h |
Lubricant Consumption | 1-1.3g/kw.h |
Noise | 75-105dB(A) |
Cylinder Number | 4/6/12 |
Cylinder Bore | 100/105/135/138/190mm |
Starting System | DC 24V Electric Motor |
Sparking Mode | Spark Plug |
Cooling Method | Circlulating Water Cooling |
Lubricant Method | Passive and Flying Lubricant |
Isolation Class | H |
Protection | IP23 |
Alternator | Siemens, Standford, Leroy Somer, Marathon, etc. |
Power Factor | 0.8 Lagging |
Exciting Method | Brushless |
Colour | You Decide |
Certificates | ISO 9001:2008, CE |
Warranty | 1 Year |
Overheal Time | More Than 30000h |
Type | Open |
Control System | Automatic Alarm System |
Size | 1450*700*1100mm~6000*1970*2735mm |
Weight | 600kg~12000kg |
Applied Range for Natural Gas Generator
1. Oil Field
2. Industrial Zone
3. Petroleum Chemical
4. Using Natural Gas Generator Set as Standby Power Source
5. Supplying Power for Auxiliary Engine which work in Oil Well.
Â
Service committee for gas generator:
1. Pre-sale service:Â
1) We will send our engineer to prospect the site of power station free of charge.
2) According to the situation of site, we will provide design drawings, such as power plant floor drawing, cooling system drawing, genset foundation, control room design, etc.
Â
2. Sale service:
1) Operator training would be conducted by Lvhuan technicians during the process of commissioning or Factory training course in China,
2) Installation and commission of the genset would be instructed assisted by Lvhuan technicians at site.
Â
3. After-sale service:
1) We have strong after-sale team, we will response within 24 hours and provide technical supports by phone or site guiding, help our clients to gain the biggeset profit.
2) For the quality problem, we will service for you free of charge during the guarantee period.
3) We  provide one year guarantee period and lifetime service.
Â
Plentiful spare part supply:
1. We have spart parts department, plentiful spare part supply for all genset model will guarantee genset lifetime running.
2.All parts were from original factories or professional factories,complete in specification, keep good quality.
Â
FAQs:
1. Are you factory? and where is your factory?
Yes, we are. Our factory is located in Zhangqiu Longshan subdistrict, Jinan city, Shandong province, Welcome to visit our factory.
2. How to choose the right model?
To choose a right model, we need to know required continuous output power, local voltage and frequency and fuel (such as diesel, natural gas, biogas, biomass gas, coal gas, syngas, etc.). For biomass power plant and coal gas power plant, some clients may doesn't have gasification system, then we need information about raw material.
Â
3. What's the genset warranty?
The warranty is one year. We will offer free service and spare parts during warranty period. Lifetime service will be provided by our trustworthy after-sale team.
Â
4. How to do the maintenance?
Operator training will be provided by our technician. After training, local operator can do the basic maintenance by themselves according to our maintenance manual.
Â
5. Will be operation training offered?
Yes, operator training would be conducted by our technicians during the process of commissioning or factory training course in China.
Â
6. What's about the installation and commissioning?
Installation and commissioning of the genset would be instructed assisted by our technicians on site.
7. What is your regular delivery time?
20 days after order releasing.
Certificates & Patents for gas generator: We are committed to providing every product superior in quality.Â
Â
Professional Manufacturer for Gas Generator
Â
Showcase for Generators
Â
Customers Trust our Gas Generators
Â
Professional Packing & Loading Team
Â
Please feel free to contact Sarah for any question.
Â
Continuous Energy-saving Rope Washing Machine
HESHAN CITY HONGFA COMPLETE SOLUTIONS MACHINE LTD. , https://www.hongfadyeing.com